Two-Lane Traffic Over Waldron Bridge Begins Today

Two-Lane Traffic Over Waldron Bridge Begins Today

PIERRE — Two-lane, head-to-head traffic over the John C. Waldron Memorial Bridge between Pierre and Fort Pierre begins today. Pierre Area Engineer for the South Dakota Department of Transportation Dean VanDeWiele says overall construction of the new bridge is on track…

VanDeWiele says reconstruction of the Yellowstone intersection with Highways 14, 34 and 83 should be done close to the 4th of July…

A 10-foot width restriction is in place over the current bridge. Traffic wider than 10 feet is being detoured over the Oahe Dam.